Underpinning & neighbour matters

When does underpinning become a Party Wall matter?

Underpinning is not automatically a Party Wall matter simply because it strengthens or deepens foundations. The relevant question is whether the proposed work exercises rights under the Party Wall etc. Act 1996, affects a party structure, or forms part of qualifying excavation near an adjoining building.

Basement and structural projects often combine underpinning with excavation, temporary support and work to shared structures. That is why the Party Wall review needs to follow the actual construction sequence rather than rely on the project label alone.

Hourican Associates reviews the architectural and structural information and identifies which statutory procedures and project-specific safeguards are proportionate.

Useful information for review

  • Underpinning layout and sequence.
  • Existing and proposed foundation levels.
  • Temporary-works information where available.
  • Adjoining-property and party-wall relationship.
  • Intended programme and any notices already served.
Key underpinning issues

What may need Party Wall consideration?

The review should remain focused on the rights exercised under the Act and the potential effect on adjoining property.

Technical scope

What the Party Wall surveyor reviews — and what remains with the engineer

The Party Wall surveyor needs enough technical information to understand the notifiable work, construction sequence and any reasonable safeguards relevant to the statutory dispute.

The Building Owner's structural engineer remains responsible for the engineering design. Party Wall review does not transfer that design responsibility to the appointed surveyor.

Typical review points

  • Underpinning sequence and temporary support.
  • Adjoining foundation levels and interfaces.
  • Access, protection and working arrangements.
  • Whether specialist engineering input is proportionate.
Our process

Typical underpinning Party Wall process

Early review is useful because the notice route and technical information should be settled before the underpinning programme depends on them.

1

Review drawings

We review the underpinning, excavation and structural proposals.

2

Identify notices

The relevant section 2 and/or section 6 procedures are identified and notices prepared where required.

3

Neighbour response

Written consent may simplify the route; otherwise surveyors are appointed where a statutory dispute arises.

4

Condition & technical review

Relevant condition evidence and project-specific safeguards are considered.

5

Award & construction

Where required, the Award records the matters determined under the Act before the notifiable works proceed.

Fees

Underpinning Party Wall fees

Underpinning and complex structural Party Wall matters are quoted individually because the scope depends on the design, number of Adjoining Owners, inspection requirements and level of technical review.

Standard notice and Schedule of Condition fees may still apply where those services are instructed separately.

Professional standards

Why appoint Hourican Associates?

Underpinning requires the statutory process to reflect the construction sequence and the actual relationship with adjoining property.

Hourican Associates is a Chartered Building Consultancy specialising in Party Wall surveying across London. The firm is regulated by RICS. Richard Hourican's supplied qualifications and memberships are MFPWS, BSc (Hons), MCIOB, MCABE and AssocRICS. His Pyramus & Thisbe Society membership is company-supplied, pending a current membership record.

We are based at Chiswick Park and advise on underpinning, excavation and basement Party Wall matters across Greater London.

Specific questions

Underpinning & Party Wall FAQs

These answers cover practical points not already explained above.

No. The proposed work must engage a relevant right or notice provision under the Act. The drawings and property relationship need to be reviewed first.

Yes. The Act includes a right to underpin a party structure in specified circumstances, so a Party Structure Notice can be required before exercising that right.

Yes, where the project includes qualifying excavation within the statutory 3 metre or 6 metre tests. The excavation depth relative to adjoining foundations is critical.

No. Structural design responsibility remains with the Building Owner's engineer and design team. The surveyor considers the information relevant to the Party Wall dispute.

Not automatically. The specific issue is whether the proposal amounts to special foundations beneath adjoining land, for which the Act requires the Adjoining Owner's written consent.

Potentially, where independent specialist advice is proportionate to a defined issue the appointed surveyor or surveyors need help determining.

Planning underpinning close to a neighbour?

Send us the underpinning layout, sections and available structural information. We can identify the Party Wall requirements and appropriate review scope.

Request underpinning Party Wall advice

Call 020 8849 8390 if you would prefer to discuss the matter first.