Schedule of Condition Surveys in London

A clear record of relevant visible property condition before nearby building, structural or excavation works begin.

Pre-works evidence

What is a Schedule of Condition?

A Schedule of Condition is a dated written and photographic record of the visible condition of relevant parts of a property before nearby works begin.

The survey records features such as cracks, finishes, defects and other visible conditions that may later be relevant if damage is alleged. It provides a useful reference point for both owners, but it is not a structural survey and does not by itself determine the cause of any later defect.

It can be commissioned as part of a Party Wall appointment or as a standalone pre-works record where nearby construction could give rise to later disagreement.

Typical fee

typically £385–£585

+ VAT

Typical fee for a standard Schedule of Condition, depending on the works and size of the property.

Basement and more extensive whole-property surveys are quoted separately because they usually require a broader and more detailed inspection.

Survey scope

What does the Schedule record?

The inspection should be proportionate to the proposed works and the areas that could reasonably be affected.

Photographic record

Clear photographs provide visual evidence of relevant finishes, defects, cracks and features visible at the time of inspection.

Written condition notes

The report describes the visible condition of the inspected walls, ceilings, floors, finishes and other relevant elements in a structured written schedule.

Existing defects

Pre-existing cracking, staining, movement-related features, damaged finishes and other visible defects are recorded where relevant to the agreed inspection area.

A Schedule of Condition records what is visibly observable at the inspection date. It is not a guarantee that no hidden defects exist and is not a structural diagnosis unless a separate specialist investigation has been instructed.

When to consider one

Projects where a pre-works record is useful

The value of the survey increases where proposed works are close to a neighbouring building, structurally significant or likely to make later damage questions difficult.

Loft conversions

Useful where steelwork, party wall alterations, chimney changes or roof works could lead to later questions about cracking or finishes.

Loft conversion Party Wall advice

Extensions

Rear and side extensions can involve excavation, structural alterations and works close to neighbouring buildings or boundaries.

Rear extension Party Wall advice

Excavation

Deeper or close-proximity excavation can justify a careful record of areas potentially affected by movement, vibration or construction activity.

Excavation Party Wall advice

Basement works

Basement projects can require a wider inspection because excavation, underpinning and temporary works may affect more of the adjoining property.

Basement Schedule of Condition
Party Wall context

Is a Schedule of Condition required by the Party Wall Act?

No. Recording a Schedule of Condition is not a statutory requirement of the Party Wall etc. Act 1996.

It is nevertheless commonly prepared because it provides a useful pre-works record. GOV.UK guidance notes that an Award can be made without one, but that proving whether later damage is attributable to the works may be more difficult without that evidence.

Where a statutory dispute exists, the Party Wall Award resolves the matters in dispute. The Schedule of Condition can support that process, but it does not replace the Award.

Three different documents

  • Party Wall Notice
    Formal notification of proposed notifiable works.
  • Schedule of Condition
    Written and photographic evidence of relevant visible pre-works condition.
  • Party Wall Award
    The surveyor-made determination settling matters in dispute under the Act.
The inspection

How our Schedule of Condition service works

The inspection scope is agreed around the proposed works and the parts of the property that are reasonably relevant.

1

Confirm the scope

We review the property, proposed works and inspection requirement to determine which areas should be recorded.

2

Inspect the property

The surveyor visually inspects the agreed areas and records relevant visible condition, finishes and defects.

3

Prepare the record

Photographs and written notes are compiled into a dated Schedule of Condition that can be referred to later.

4

Issue the Schedule

The completed record is issued to the relevant parties and, where appropriate, referred to or incorporated into the Party Wall documentation.

Survey extent

Standard and basement Schedules of Condition

A proportionate Schedule should match the potential effects of the proposed works. More extensive projects may require a broader record.

Standard survey

Typical residential works

For many loft conversions, extensions and structural alterations, the inspection focuses on the parts of the neighbouring property reasonably relevant to the works.

Standard surveys are typically £385–£585 + VAT, depending on the works and size of the property.

Basement / wider inspection

More extensive works

Basement excavation, underpinning and higher-risk structural work can justify a wider inspection because the potential zone of influence may extend through more of the adjoining property.

These surveys are quoted separately after the works and property are reviewed.

Basement Schedule of Condition service
Professional surveying

Why choose Hourican Associates?

A useful Schedule of Condition needs to be clear, proportionate and easy to compare with the property after the works.

Hourican Associates is a Chartered Building Consultancy specialising in Party Wall surveying across London. The firm is regulated by RICS. Richard Hourican's supplied qualifications and memberships are MFPWS, BSc (Hons), MCIOB, MCABE and AssocRICS. His Pyramus & Thisbe Society membership is company-supplied, pending a current membership record.

We are based at Chiswick Park and carry out Schedule of Condition Surveys throughout Greater London for residential, commercial and more complex Party Wall matters.

What you can expect

  • A survey scope matched to the proposed works.
  • Clear written notes supported by photographs.
  • A dated record that can be referred to if damage is later alleged.
  • Separate pricing for wider basement and whole-property inspections.
Related Party Wall services

Useful next steps

A Schedule of Condition may sit alongside notices, surveyor appointments and an Award depending on how the Party Wall process develops.

Specific questions

Schedule of Condition FAQs

These questions cover practical points not already explained above.

No. The inspection should be proportionate to the proposed works and the areas that could reasonably be relevant. A standard residential Schedule may therefore cover selected areas, while a basement or more complex project can justify a wider or whole-property inspection.

It provides important evidence of the property's visible condition before the works, but it does not automatically prove causation. If damage is disputed, the Schedule is considered alongside the nature of the works, timing, later inspections and any other relevant evidence.

It can still record the condition visible at the inspection date, but its value as a true pre-works benchmark is reduced once potentially relevant construction has begun. Where possible, the inspection should therefore take place before the notifiable or potentially affecting works start.

A Schedule cannot be prepared for areas that cannot be inspected. Under the Party Wall procedure an Award can still be made without a Schedule of Condition, but the absence of a pre-works record may make later damage questions harder to assess.

Not necessarily. Whether a later inspection is appropriate depends on the agreed service, the Party Wall Award where relevant, the nature of the works and whether damage or another issue needs to be assessed.

Yes, where that surveyor is properly appointed for the Party Wall matter. The Schedule of Condition is commonly prepared as part of the wider surveyor appointment and then referred to in the Award or retained with the Party Wall records.