WhatsApp 020 8849 8390
Basement condition record · London

Schedule of Condition Survey for Basement Works London

Detailed written and photographic pre-works condition records for adjoining property affected by basement excavation, underpinning and other complex structural works.

Wider pre-works evidence

Why basement projects often justify a more detailed Schedule of Condition

A basement Schedule of Condition records the visible condition of relevant parts of the adjoining property before excavation or underpinning begins.

Because basement works can extend below existing foundations and involve temporary support, the appropriate inspection area may be wider than for a straightforward loft conversion or small extension.

The survey remains a record of visible condition. It is not a structural survey, does not expose hidden defects and does not by itself prove the cause of any later change.

Typical survey evidence

  • Written room-by-room or area-based notes.
  • Dated photographs of relevant finishes and defects.
  • Existing cracking and movement-related features.
  • External areas relevant to the excavation.
  • Clear identification of the inspection scope.
Basement-specific scope

What may justify a wider inspection?

The scope should follow the proposed works, structural sequence and areas that could reasonably be relevant if a concern is raised later.

Party Wall context

A Schedule is useful evidence, not a statutory requirement

Recording a Schedule of Condition is not required by the Party Wall etc. Act 1996, although it is commonly recommended and often referred to in a Party Wall Award.

An Award can still be made without a Schedule, but the absence of a pre-works record can make later damage questions more difficult to assess.

What it does not do

  • It does not certify structural adequacy.
  • It does not identify every hidden defect.
  • It does not automatically prove later causation.
  • It does not replace the Party Wall Award.
Our process

Our basement Schedule of Condition process

The survey scope is agreed around the project rather than automatically treating every basement as a whole-property inspection.

1

Review works

The excavation, underpinning and adjoining-property relationship are reviewed.

2

Agree scope

The relevant internal and external areas to be recorded are identified.

3

Inspect

Visible condition is photographed and described systematically.

4

Issue record

The dated Schedule is compiled and issued to the relevant parties.

5

Reinspect if needed

A later comparison can be arranged if damage or a material change is reported.

Fees

Basement Schedule of Condition fees

Basement and more extensive Schedule of Condition Surveys are priced separately because the inspection can involve a wider area and greater level of detail than a standard residential Schedule.

Standard Schedules of Condition are typically £385–£585 + VAT; the basement scope is quoted after review of the property and works.

Professional standards

Why appoint Hourican Associates?

A useful basement Schedule is proportionate, systematic and clear enough to support a later like-for-like comparison.

Hourican Associates is a Chartered Building Consultancy specialising in Party Wall surveying across London. The firm is regulated by RICS. Richard Hourican's supplied qualifications and memberships are MFPWS, BSc (Hons), MCIOB, MCABE and AssocRICS. His Pyramus & Thisbe Society membership is company-supplied, pending a current membership record.

We carry out detailed pre-works condition surveys for basement and underpinning projects across Greater London.

Specific questions

Basement Schedule of Condition FAQs

These answers cover practical points not already explained above.

No. The scope should be proportionate to the works and the areas that could reasonably be affected. Some projects justify a whole-property record; others do not.

No. It is prudent evidence rather than a statutory requirement, and an Award can be made without one.

It records visible condition unless a separate specialist investigation is instructed. It is not a structural survey.

It can show whether visible condition changed, but causation may need to be assessed using the construction sequence, monitoring and other evidence.

Yes. A reinspection can compare reported changes against the original written and photographic record.

They can require a wider inspection and more detailed record because the excavation and structural work may have a broader relationship with the adjoining property.

Book a basement Schedule of Condition

Send us the basement drawings and property details. We can advise on the appropriate inspection scope and provide a clear quotation.

Request a basement condition survey

Call 020 8849 8390 if you would prefer to discuss the matter first.