If your property is in Hammersmith, this page explains when the Party Wall etc. Act 1996 may apply, the main notice routes, typical Hourican Associates fees and the local issues most relevant to common residential projects.
Party Wall Advice for Hammersmith Property Owners and Neighbours
Whether the Act applies depends on the construction being proposed, the structures or boundaries affected, the depth of any excavation and the adjoining ownership—not simply the type of project.
The sections below explain the Party Wall issues most relevant to common Hammersmith residential works and link to detailed guidance for each statutory route.
What Do You Need Party Wall Help With?
I Am Planning Building Work
Send us the property address and your architectural or structural drawings. We can identify likely notifiable works, affected adjoining owners and the correct notice route before the construction programme depends on neighbour responses.
I Have Received a Party Wall Notice
Send us the notice and drawings. We can explain what is proposed, whether the statutory route appears appropriate and what options you have before deciding whether to consent or appoint a surveyor.
We Would Prefer One Surveyor
Where a statutory dispute has arisen and both owners agree, one impartial Agreed Surveyor may be appointed instead of each owner choosing a separate surveyor. The surveyor must act impartially under the Act.
When Might the Party Wall Act Apply in Hammersmith?
The Party Wall etc. Act 1996 covers work to existing party structures, certain new walls at the line of junction and qualifying excavation close to neighbouring buildings. The construction details—not simply the project label—determine whether notice is needed.
Work to a Party Wall or Structure
Loft steel, chimney breast removal, cutting into a party wall, raising a party wall and other structural alterations can require a Party Structure Notice under Section 2.
Serving notice does not automatically mean a Party Wall Award is required. A valid written consent can mean the statutory dispute procedure is not needed.
Excavation Within 3 or 6 Metres
Within 3 metres, Section 6 can apply where the proposed excavation will go lower than the bottom of the adjoining owner’s foundations.
Within 6 metres, it can apply where the excavation would extend below the statutory 45-degree line drawn downwards from the bottom of those foundations towards the excavation.
Distance alone does not determine whether notice is required.
Building at the Boundary
Section 1 can apply where a new wall is proposed at the line of junction. The procedure differs depending on whether the wall is proposed astride the boundary or wholly on the Building Owner’s land.
The Act does not give Party Wall Surveyors power to determine an unrelated dispute about the true legal position of a boundary.
Party Wall Notice Periods
| Proposed work | Typical notice | Minimum notice period |
|---|---|---|
| Work to an existing party wall or party structure | Section 2 Party Structure Notice | Normally 2 months |
| New wall at the line of junction | Section 1 Line of Junction Notice | Normally 1 month |
| Qualifying excavation close to neighbouring foundations | Section 6(1) or 6(2) Notice | Normally 1 month |
One project can require more than one notice. Section 6 notices must include plans and sections showing the location and depth of the proposed excavation and the proposed building or structure.
Hammersmith Party Wall Considerations
Terraced Houses & Side Returns
Victorian and Edwardian terraces around Hammersmith and Brackenbury often combine loft works with rear or side-return extensions, so the same project can involve Section 2 and Section 6 matters.
Converted Flats & Shared Structures
Converted houses can have party structures formed by separating floors and ceilings as well as walls. Leasehold and freehold interests may mean more than one owner must be considered.
Basements & Constrained Sites
Where excavation is proposed close to an adjoining building, the actual foundation depth and the statutory 3 metre or 6 metre tests matter—not the distance alone.
Hammersmith contains many period streets and conservation areas. Planning or conservation controls are separate from the Party Wall etc. Act 1996, so a project can need both planning approval and Party Wall Notices.
For Building Owners in Hammersmith
Early Party Wall advice can stop notice requirements becoming a late construction-programme problem. We review the actual drawings rather than assuming that every loft, extension or excavation follows the same statutory route.
- Review of architectural and structural drawings
- Identification of works covered by Sections 1, 2 or 6
- Land Registry ownership checks where appropriate
- Preparation and service of valid Party Wall Notices
- Neighbour response management
- Schedules of Condition where proportionate
- Agreed Surveyor appointments
- Party Wall Awards where a statutory dispute requires one
Received a Party Wall Notice in Hammersmith?
Receiving a notice does not mean you must automatically consent or automatically object. The sensible response depends on the works, the supporting information and the potential effect on your property.
Where appointed as an Adjoining Owner’s Surveyor, our role can include reviewing drawings and structural information, inspecting the property, preparing a Schedule of Condition and agreeing reasonable safeguards within an Award.
A surveyor appointed under the Act acts impartially rather than as an advocate for the owner who selected them.
Schedule of Condition Surveys in Hammersmith
A Schedule of Condition is a written and photographic record of the visible condition of relevant parts of the adjoining property before work starts.
It is not automatically required by the Act, but it can be valuable evidence for both owners if cracking or other damage is alleged later. The scope should be proportionate to the risk: a standard extension may need a targeted record, while a basement or complex excavation can justify a more detailed survey.
Published Hourican Associates Project Experience in Hammersmith
Our published project map includes the following Party Wall appointments in this area. We show only the recorded project location and project type here.
W6 7BL
Brook Green
Extension
Listed on the Hourican Associates London Party Wall project map.
W6 0DU
Carthew Road
Extension
Listed on the Hourican Associates London Party Wall project map.
W12 9HS
Boscombe Road
Refurbishments
Listed on the Hourican Associates London Party Wall project map.
How Much Does a Party Wall Surveyor Cost in Hammersmith?
We set out the proposed scope and fee before instruction. Cost depends on the property, number of adjoining owners, proposed works and whether a statutory dispute arises.
Party Wall Notices
£150 + VAT per adjoining owner
Including title checks, preparation and service of the notice and follow-up communication.
Schedule of Condition
Typically £385–£585 + VAT
Depending on the works and size of the property. Basement surveys are priced separately where a more detailed inspection is required.
Full Party Wall Award
Typically £1,100–£1,500 + VAT
Depending on the property and project. A full appointment can include serving notice, carrying out the relevant survey and agreeing the Award.
Send us the property address and drawings for a project-specific quotation.
Areas We Cover in Hammersmith
Serving hammersmith, ravenscourt park, brackenbury village, brook green and nearby w6 neighbourhoods.
W6
Hammersmith & Ravenscourt Park
Hammersmith town centre, Ravenscourt Park and the surrounding W6 streets.
W6 / W12
Brackenbury & Shepherd’s Bush borders
Brackenbury Village, Brook Green and homes close to the Shepherd’s Bush boundary.
W14
West Kensington & Barons Court
West Kensington and Barons Court properties within the wider Hammersmith and Fulham area.
For wider regional guidance, see our West London Party Wall Surveyor page.
Hammersmith Party Wall FAQs
No. If the work is covered by the Act, the relevant notice procedure must be followed, but a Party Wall Award is not automatic. If the Adjoining Owner validly consents, a statutory surveyor appointment may not be required.
Within 3 metres, Section 6 can apply where the proposed excavation will go below the bottom of the adjoining foundations. Within 6 metres, it can apply where the excavation would extend below the statutory 45-degree line drawn downwards towards the excavation from the bottom of those foundations. Distance alone is not enough.
A Section 2 Party Structure Notice normally requires at least two months’ notice. Section 1 Line of Junction notices and Section 6 excavation notices normally require at least one month. Earlier commencement requires the appropriate written agreement where the Act allows it.
Read the notice and supporting drawings before responding. You can consent or, where the Act provides for it, dissent and appoint a surveyor. Hourican Associates can review the documents and explain the options before you decide.
Not exactly. “Party Wall Agreement” is a common phrase. An Adjoining Owner may simply consent in writing to a valid notice. Where a statutory dispute arises and surveyors are appointed, the formal determination is normally a Party Wall Award.
Not through the Party Wall Act. Surveyors can deal with statutory matters arising from works at the line of junction, but an Award cannot determine an unrelated dispute about the true legal position of a boundary.
Not automatically. It is commonly used because it records visible pre-existing condition and can reduce later disagreement about damage. The appropriate scope depends on the property and risk of the proposed work.
Hourican Associates charge £150 + VAT per adjoining owner for the Party Wall Notice service. Standard Schedules of Condition are typically £385–£585 + VAT. Full Party Wall Award appointments are typically £1,100–£1,500 + VAT depending on the property and project. Basement surveys are quoted separately where a more detailed inspection is required.
Why Choose Hourican Associates for Party Wall Advice in Hammersmith?
Hourican Associates are a RICS-regulated Chartered Building Consultancy specialising in Party Wall matters, combining technical building knowledge, statutory experience and clear communication.
Specialist
Party Wall Focus
Party Wall surveying is a core area of our practice, including notices, Schedules of Condition, Agreed Surveyor appointments and Awards.
Qualified &
Professional
RICS-regulated Chartered Building Consultancy with professional memberships and qualifications including FPWS, CIOB, MCABE and the Pyramus & Thisbe Club.
Clear
Fees
We set out the proposed scope and fee before instruction so you understand the likely cost and next step.
Drawing-Led
Advice
We review the actual project information rather than relying on generic assumptions about lofts, extensions or excavation.
Neighbourly
Approach
We administer the statutory process properly while keeping communication proportionate, practical and constructive.
Speak to a Party Wall Surveyor in Hammersmith
Planning a loft conversion, extension, excavation, chimney removal, structural alteration or boundary wall? Or have you received a Party Wall Notice from your neighbour?
Send us the property address, drawings or notice you have received. We can explain the likely statutory route and provide a clear quotation.
Working with Richard has been the easiest part of our recent building project, would certainly use again. He agreed the Party Wall Awards quickly and without any prompting needed from our side.
We couldn’t be happier with the professional advice and service we received from Richard. He went above and beyond our expectations in handling a particularly difficult party wall award which we are extremely grateful for. I highly recommend Richard’s services to anyone and will definitely use his services again in the future.
Excellent service, would highly recommend. Richard made the party wall process pain free with both my neighbours happy with the agreements which were drawn up. Chiswick W4
Richard is a very professional and supportive expert. We have received lots of really helpful advice from the company and as such we feel assured we are carrying out our works appropriately. He is really friendly and puts complicated legal jargon into a laypersons language! I would most definitely use Hourican & Associates again and would not hesitate to recommend them to all. Thank you Richard!
We were extremely impressed with the service provided by Hourican Associates. We needed a Schedule of Condition completed to a tight deadline. Richard and his team were able to squeeze us in last minute to accommodate the project. Very professional and competitively priced service. I would highly recommend.
I would thoroughly recommend H&A having been referred by the company who are doing my loft conversion, about an unusual party wall matter. Richard was very helpful, professional and knowledgeable and willing to give some free, solid advice. A rarity these days! Should I need the services of a surveyor again in the future, I wouldn’t hesitate to use them and would I’d recommend wholeheartedly to others.
Fantastic service from Richard, would highly recommend.
Richard helped us with a challenging party wall agreement where both the leaseholder and freehold adjoining owner insisted on having separate surveyors for the removal of a chimney stack. He was clearly familiar with the different surveyors in the industry which was helpful. He worked tirelessly to get this over the line, to which we are very grateful.
I got in contact with Hourican Associates for some advice on a parapet wall issue (Party Wall dispute). I wish I could have instructed Richard but unfortunately due to the way the party wall award works I couldn’t. However he was fabulous. Richard returned my call quickly and gave me lots of advice on what I could do given the circumstances, what to make sure we ask for etc and also put my mind at rest. Richard really knows his stuff in party walls and I wished I’d found him earlier. Totally recommend! Thanks Richard. I’ll be saving your number for next time!
Really professional, trustworthy and moved at pace. Really happy with the service provided.