Free Party Wall Notice Template & PDF Generator
Create a notice for works in England and Wales using our free online form. Receive your completed PDF by email, or ask our London surveyors to prepare and serve your notice.
Optional notice service: £150 + VAT per adjoining owner.
Create your free Party Wall Notice
Complete the form below with the building owner details, adjoining owner details, property address and a description of the proposed works.
Which notice do I need?
A notice tells the adjoining owner about proposed works under the Party Wall etc. Act 1996. It is not a Party Wall Award or confirmation that your neighbour has agreed. Choose the notice that matches your work; a project can require more than one type.
Scroll across the table to read all three columns.
| Notice template | Common project examples | Typical minimum notice period |
|---|---|---|
|
Line of Junction Notice Section 1 Notice |
New wall built up to or astride the boundary line, often as part of a side or rear extension. | At least 1 month before works start |
|
Party Structure Notice Section 2 / Section 3 Notice |
Cutting into a party wall for beams, removing a chimney breast, raising or thickening a party wall, or works affecting a party floor or structure. | At least 2 months before works start |
|
Notice of Adjacent Excavation Section 6 Notice / 3 metre or 6 metre notice |
Excavating for foundations, basements, rear extensions or structural works within 3 metres or 6 metres of a neighbouring building, depending on depth. | At least 1 month before works start |
These are typical minimum periods, not permission to start work. See the government's Party Wall Act explanatory booklet for the requirements and exceptions. For help understanding a notice, read our Party Wall Notice guide.
Before you serve the notice
- Check the owners and addresses. Include all building owners and identify every adjoining owner. Flats and leasehold buildings may have both freeholders and leaseholders to notify. HM Land Registry property information can help you check the registered ownership.
- Describe the work accurately. Check the generated document against your plans. For excavation work, include plans and sections that locate the excavation and any proposed building or structure, and show the depths of the excavation and any proposed foundations.
- Check the dates and signatures. Allow the relevant notice period, sign and date the notice, and check that all required details are complete before serving it. Notices are generally valid for one year, so check the timing if work is delayed.
- Choose a valid way to serve it. Discuss the work with your neighbour and keep a copy and a record of service. Receiving the PDF from this generator does not serve it on your neighbour. Email service requires the recipient's agreement to receive notices that way, an email address supplied for that purpose, and that agreement not to have been withdrawn.
If ownership, boundaries or the proposed work are unclear, obtain advice before serving. Basement work and projects affecting several neighbouring properties may need a more detailed assessment.
What happens after serving?
Keep your neighbour's written response with the notice. Consent does not remove your other duties under the Act, and the notice period still applies unless an earlier start is agreed in writing.
For party structure and relevant excavation notices, no written consent within 14 days is generally treated as a dispute. The position is different for new boundary walls; silence is not consent to build astride the boundary. If a dispute arises, the owners may appoint an Agreed Surveyor or separate surveyors to resolve it through a Party Wall Award.
A notice also does not record your neighbour's property's condition. A Schedule of Condition survey provides a written and photographic record before work starts, which can help if damage is alleged later.
Prefer a surveyor to prepare and serve it?
Send your drawings, property address and a short description of the works. We will confirm the notice requirements, scope and fee for your London project before you appoint us. Surveys and any Award work are quoted separately from the notice service.
Request a notice quoteThis tool is provided by Hourican Associates, a RICS-regulated Chartered Building Consultancy specialising in Party Wall surveying in London. Meet Richard Hourican.